Automotive

Landi Renzo

Location
Corte Tegge of Cavriago (RE), Italy
Type of intervention
Summer and winter air conditioning.
Description of intervention
Landi Renzo is world leader in the sector of components and alternative fuel systems for LPG and methane for motor vehicles. Torreggiani & C. built the mechanical systems for the offices, warehouse, workshop and R&D center at the company’s headquarters. In particular, Torreggiani & C. built the summer and winter air conditioning systems with radiant panels for the common areas and mixed fan coil plus primary air systems for the offices and classrooms. For the engine test rooms, systems to reproduce extreme climatic conditions [-35°C (-31°F) / +40°C (104°F)] — which are also capable of dissipating the thermal energy produced by the engines and absorbing the energy accumulated by the braking systems — have been designed and built. The technological plants are essentially made up of high-efficiency boilers and refrigeration units with screw compressors and heat pumps that exploit a 90,000-litre tank — already required for fire prevention in the event of fire — which acts as an energy accumulator to allow maximum energy saving.
Landi Renzo
Landi
Landi